Permit Set Drawing Service
Permit Set Drawings for Your Build
A permit set is the group of drawings your local building department reviews before it issues a permit. I draw the whole set, starting from the site plan and working through to the last section sheet.
Most of my permit work is for projects in the USA, and my drawings have been approved there. I can take on projects in other countries too. Tell me where you’re building and send any checklist or plan-review comments you already have, because every city asks for something slightly different.
What a Permit Set Includes
A recent residential set of mine ran to 13 sheets:
- Existing and proposed site plans, with lot coverage calculations
- Floor plan and dimension plan
- Foundation plan with details
- Roof plan and roof framing plan with details
- Front, rear and side elevations
- Electrical and mechanical plans
- Drainage and water supply plumbing plans
- Building section
A larger or more complicated building can need more sheets. The final list depends on the project and on what your city requires.
Price and Turnaround
A complete permit set usually takes 7 to 15 days.
I quote each project separately, based on its square footage and how complex it is. A simple one-room addition is far less drawing work than a large house with a complicated roof, so a flat rate wouldn’t be fair either way. Send me whatever you have, such as sketches, photos, measurements or a survey, and ask for a quote.
Stamps and Approval
I should be clear about this one. I prepare the drawings from Bangladesh and I’m not a licensed engineer or architect in the USA, so I don’t stamp or seal them. If your city requires a stamp, a locally licensed professional will need to review and seal the set. Check that with your building department before you order.
Approval is always the building department’s decision, so nobody can honestly promise it in advance. What I can tell you is my background: a Diploma in Architecture and a Bachelor’s in Civil Engineering. More about me.
Frequently Asked Questions
How long does a permit set take?
Usually 7 to 15 days for the complete set. Size and complexity decide where your project falls in that range.
How much do permit drawings cost?
The price depends on the square footage and the complexity of the project. Send me the details and I’ll give you a quote.
Do you stamp the drawings?
No. I’m not a licensed engineer or architect in the USA. If your jurisdiction requires a stamp, a local licensed professional will need to review and seal the drawings.
Are your drawings approved in the USA?
Yes, my drawings have been approved for projects in the USA. Requirements change from one city to the next, and the final decision belongs to the local building department.
Do you work on projects outside the USA?
Yes. Most of my permit sets are for the USA, but I can prepare them for other locations too. Please send the local requirements with your project details.
Which drawings will my project need?
It depends on the building and the city. A typical residential set covers site, floor, foundation, roof, elevation, electrical, plumbing, mechanical and section sheets, and some projects need more.
What do you need from me to start?
The project location and whatever you already have: sketches, photos, measurements, a survey, or comments from your building department.
What clients say about us
▶ Client review
▶ Client review
▶ Client review